编辑: xwl西瓜xym | 2015-02-02 |
4 Engineering structure and third party monitoring of rock and soil.13 4.1 Basic Requirements.13 4.2 Foundation pit engineering
13 4.3 Undercutting engineerin.16 4.4 Building side slope engineering.20 4.5 Bridge engineering.22
5 Around environment third party monitoring
26 5.1 Basic Requirements.26 5.2 Buildings.26 5.3 Bridges.28 5.4 Underground pipelines.29 5.5 Expressway and urban road
30 5.6 Urban rail transit facilities.31 5.7 Railways.34 5.8 Surface water and water conservancy facilities
36 5.9 Underground structures.37
6 Monitoring methods and technical requirements.38 6.1 Basic Requirements.38 6.2 Vertical displacement monitoring.39 6.3 Horizontal displacement monitoring.42 6.4 Deep horizontal displacement monitoring
46 2 6.5 Convergence deformation monitoring.47 6.6 Inclination monitoring.49 6.7 Groundwater level monitoring
50 6.8 Support internal force, anchor cable tension monitoring
51 6.9 Structural stress monitoring
51 6.10 Cable stress monitoring.51 6.11 Temperature monitoring.52 6.12 Wind monitoring
52 6.13 Crack monitoring
53 6.14 Track Static Geometry Position Monitoring
53 6.15 Inspection.54
7 Monitoring frequency.54 7.1 Basic Requirements.54 7.2 Foundation pit engineering
55 7.3 Undercutting engineering.55 7.4 Building side slope engineering.56 7.5 Bridge engineering.57
8 Monitor project control values and alarms.58 8.1 Basic Requirements.58 8.2 Monitor project control values.58
9 Monitoring results and information feedback
61 9.1 Basic Requirements.61 9.2 Results report content.61 9.3 Information feedback
62 Appendix A On-site inspection and early warning judgment reference table....63 Appendix B Monitor day report format
66 Appendix C Site inspection report forma
70 Appendix D Monitoring and alarm report sheet
75 Instructions for this technical specification.76 List of Quoted standards.77
3 1 总则1.0.1 为规范建设工程第三方监测工作,做到技术先进、经济合理、安全适用、 成果可靠,制定本规程. 1.0.2 本规程适用于房屋建筑和市政基础设施工程施工期建设工程自身结构、 周 围岩土体及周边环境的第三方监测工作. 1.0.3 建设工程第三方监测应编制合理的第三方监测方案,精心组织和实施,为 建设工程提供真实准确、可靠的监测成果. 1.0.4 建设工程第三方监测工作除应符合本规程外,尚应符合国家、行业及北京 市现行相关标准的规定.
4 2 术语和符号 2.1 术语2.1.1 建设工程 construction project 本市行政区域内房屋建筑、建筑边坡、城市轨道交通、地下管线、桥梁等房 建和市政基础设施新建、改建、扩建工程. 2.1.2 监测 monitoring measurement 施工过程中, 采用测量测试仪器设备, 对工程支护结构、 主体结构、 岩土体、 地下水和周边环境等的变化情况进行量测和巡查,并及时反馈监测成果的活动. 2.1.3 第三方监测 third party monitoring measurement 建设单位依法委托第三方机构对工程结构、岩土体及周边建(构)筑物等进 行量测和巡查,并及时计算、分析量测巡查信息和反馈监测成果的活动. 2.1.4 基坑工程 foundation pit engineering 为进行建(构)筑物基础、地下建(构)筑物施工所采取的支护、降水(止水)和土方开挖等而形成的地下空间,是集地质工程、岩土工程、结构工程及监 测检测技术于一体的系统工程. 2.1.5 暗挖工程 undercutting engineering 不挖开地面而在地下采用人工或机械进行挖掘和推进施工的工程, 包括矿山 法、盾构法及顶管法等暗挖工程. 2.1.6 建筑边坡工程 building slope engineering 在建筑场地及其周边, 为建筑工程和市政工程施工而开挖或填筑所形成的人 工边坡工程. 2.1.7 桥梁工程 bridge engineering 为使车辆行人等能跨越障碍、顺利通行而建造建(构)筑物的施工工程. 2.1.8 周边环境 around environment 工程建设中与工程相互影响、 位于地面或地下的既有或在建的建(构)筑物(含 文物古建)、管线、桥梁、隧道、地下工程设施、轨道交通设施、铁路、高速公 路、城市道路、地表水体及树木等的统称. 2.1.9 ........