4 支挡式结构.15 4.1 结构分析.15 4.2 稳定性验算.18 4.3 排桩设计.23 4.4 排桩施工与检测.24 4.5 地下连续墙设计.25 4.6 地下连续墙施工与检测.26 4.7 锚杆设计.27 4.8 锚杆施工与检测.30 4.9 内支撑结构设计.32 4.10 内支撑结构施工与检测.35 4.11 支护结构与主体结构的结合及逆作法.35 4.12 双排桩设计.39
5 土钉墙.42 5.1 稳定性验算.42 5.2 土钉承载力计算.44 5.3 构造.46 5.4 施工与检测.48
6 重力式水泥土墙.50 6.1 稳定性与承载力验算.50 6.2 构造.52 6.3 施工与检测.53
7 地下水控制.54 7.1 一般规定.54 7.2 截水.54 7.3 降水.56 7.4 集水明排.62 7.5 降水引起的地层变形计算.63
8 基坑开挖与监测.64 8.1 基坑开挖.64 8.2 基坑监测.64
5 附录A 圆形截面混凝土支护桩的正截面受弯承载力计算.68 附录B 锚杆抗拔试验要点.70 B.1 一般规定.70 B.2 基本试验.70 B.3 蠕变试验.71 B.4 验收试验.72 附录C 渗透稳定性验算.73 附录D 土钉抗拔试验要点.75 附录E 基坑涌水量计算
76 本规程用词说明.79 引用标准名录.80 附:条文说明.81
6 CONTENTS
1 General Provisions
1 2 Terms and Symbols
2 2.1 Terms
2 2.2 Symbols
3 3 Fundamental Requirements
6 3.1 Principles of Design
6 3.2 Investigation of Excavated Site and Surrounding Area
8 3.3 Choice of Structural Types
9 3.4 Horizontal Load
10 4 Retaining S tructures
15 4.1 Structural Analysis
15 4.2 Stability Analysis
18 4.3 Design of Soldier Pile Wall
23 4.4 Construction and Test of Soldier Pile Wall
24 4.5 Design of Diaphragm Wall
25 4.6 Construction and Testing of Diaphragm Wall
26 4.7 Design of Anchor
27 4.8 Construction and Test of Anchor
30 4.9 Design of Strut
32 4.10 Construction and Testing of Strut
35 4.11 Excavations Supported by Permanent Structure and Top-Down Method …… ……35 4.12 Design of Double-Row-Piles Wall
39 5 Soil S ailing Wall
42 5.1 Stability Analysis
42 5.2 Bearing Capacity Calculation of Soil Nail
44 5.3 Structural Details ofSoil Sailing Wall
46 5.4 Construction and Testing of Soil Sailing Wall
48 6 Gravity Cement-Soil Wall
50 6.1 Stability Analysis and Bearing Capacity
50 6.2 Structural Details ofGravity Cement-Soil Wall
52 6.3 Construction and Test of Gravity Cement-Soil Wall
53 7 Groundwater Control
54 7.1 General requirement…54 7.2 Cut-Off Drains
54 7.3 Dewatering
56 7.4 Drainage Galleries
62 7.5 Calculation of Ground Settlement due to Dewatering
63 8 Excavation and m onitoring
64 8.1 Excavation
64 8.2 Monitoring
64 Appendix A Flexural Capacity Calculation of R.C. Pile…68 Appendix B Kernel of Anchor Pull Out Test
70 B.1 General requirement
70 7 B.2 Basic Test
70 B.3 Creep Test
71 B.4 Verification Test
72 Appendix C Seepage Stability Analysis
73 Appendix D Kernel of Soil Nail Pull Out Test
75 Appendix E Simplified Calculation for Water Discharge in Excavation Pit …………………76 Explanation of Wording in This Code.79 List of Quoted Standards.80 Addtion: Explanation of Provisions
81 1
1 总则 1.0.1 为了在建筑基坑支护设计、施工中做到安全适用、保护环境、技术先进、经济合理、确 保质量,制定本规程. 1.0.2 本规程适用于一般地质条件下临时性建........