2016 年6月Journal of Harbin Engineering University Jun.2016 甘孜地热发电热力计算及优化 王延欣1,2 ,王令宝3 ,李华山3 ,卜宪标3 (1. 中国石化集团新星石油有限责任公司,北京 100083;

2. 中石化新星四川地热能开发有限公司,四川 成都 610096;

3. 中国 科学院广州能源研究所,广东 广州 510640) 摘要:为给后续地热电站建设提供设计依据,以甘孜地热井作为研究对象,根据放喷获得的冷热源数据对发电工 艺进行选择并对热力过程进行计算,考虑发电规模和设备供应,选择有机朗肯循环及其两种改进型作为发电工艺. 通过热力计算比较三种发电工艺的性能,优选出适宜的发电工艺. 结果表明:存在最优的蒸发温度使单位热水发 电量最大,基本朗肯循环(BORC)、闪蒸朗肯循环(FORC) 和两级朗肯循环(TSORC) 对应的最优蒸发温度分别为

60、70 和75 ℃ ,在该温度下,对应的热效率分别为 10.74%、10.89%和11.45%,单位热水发电量分别为 8.

77、10.09 和10.3 kW・h/ t,地热尾水排放温度分别为 45.

02、35.55 和37.9 ℃ . 仅从上述三个参数考虑,TSORC 系统最优,FORC 系统次之. 关键词:地热发电;

热力计算;

有机朗肯;

性能对比;

地热 DOI:10.11990/ jheu.201504026 网络出版地址:http:/ / www.cnki.net/ kcms/ detail/ 23.1390.u.20160421.1039.002.html 中图分类号: TK52 文献标志码:A 文章编号:1006?7043(2016)06?0873?05 Thermodynamic calculation and optimization of geothermal power generation in Ganzi WANG Yanxin1,2 , WANG Lingbao3 , LI Huashan3 , BU Xianbiao3 (1. Sinopec Star Petroleum Co., Ltd, Beijing 100083, China;

2. Sinopec Star Petroleum Sichuan geothermal development Co., Ltd, Chengdu 610096, China;

3. GuangZhou Institute of Energy Conversion,Chinese Academy of Sciences, Guangzhou 510640, China) Abstract:A geothermal well in Ganzi was chosen for the study. To provide a reference for the design and construc? tion of a geothermal plant, power generation techniques were selected and the thermodynamic process was calculat? ed based on cold and heat source data obtained through choke. Considering the power generation scale and equip? ment supply, the organic rankine cycle (ORC) and its two improved versions were selected as the power generation techniques. The power generation performances of the three techniques were compared using thermodynamic calcu? lation. The results showed that there is an optimal evaporation temperature at which the power generation from unit hot water is at a maximum. The optimal evaporation temperatures for basic ORC (BORC), flashing ORC (FORC), and two?stage ORC (TSORC) are 60,

70 and

75 ℃, respectively;

the corresponding thermal efficiencies are 10. 74%, 10.89% and 11.45%;

the power generation from unit hot water 8.77, 10.09 and 10.3 kW・h / t;

and the tail water temperature 45.02, 35.55 and 37.9 ℃. Considering the above three parameters, the TSORC is the best cycle, followed by the FORC. Keywords:geothermal power generation;

thermodynamic calculation;

organic Rankine;

performance comparison;

geothermal 收稿日期: 2015-04-17. 网络出版日期:2016-04-21. 基金项目:国家高技术研究发展计划(2012AA053003);

广州市珠江 科技新星专项计划(2014J2200079);

甘孜地区地热发电技 术研究项目(10500000-14-ZC0607-0005). 作者简介:王延欣(1982-),男,工程师;

卜宪标(1979-),男,博士研究生. 通信作者:卜宪标,E-mail:buxb@ ms.giec.ac.cn. 随着化石能源的短缺,地热能的利用越来越受 到人们重视[1] .