编辑: xiong447385 | 2018-08-27 |
3 Installation dimensions * applies only to MTA
120 5.2.2 Tank hole and cable entry Fig.
4 Tank hole and cable entry TM04
7991 1411 Pump C D1 [mm] D2 [mm] L [mm] X [mm] MTA
30 Rp 3/8 / G 1/2 / 1/2 NPT
132 116
100 ?
7 MTA
60 Rp 1/2 / G 3/4 / 3/4 NPT
160 143 112.5 ?
10 MTA
90 Rp 3/4 / G 3/4 / 3/4 NPT
160 154 112.5 ?
10 MTA
120 Rp
1 / G
1 1/4 /
1 1/4 NPT
180 155 126.5 ?
10 MTA
200 Rp
2 / G
1 1/2 /
1 1/2 NPT
220 200 134.5 ?
12 MTA 20H Rp 3/8 / G 1/2 / 1/2 NPT
132 116
100 ?
7 MTA 40H Rp 1/2 / G 3/4 / 3/4 NPT
160 143 112.5 ?
10 MTA 70H Rp 3/4 / G 3/4 / 3/4 NPT
160 154 112.5 ?
10 MTA 100H Rp
1 / G
1 /
1 NPT
180 175
124 ?
10 TM05
0632 1311 Pump Tank hole Cable entry hole D1 [mm] D2 [mm] MTA
30 ?
90 ?
22 MTA
60 ?
115 ?
22 MTA
90 ?
128 ?
22 MTA
120 ?
135 ?
22 MTA
200 ?
180 ?
22 MTA 20H ?
100 ?
22 MTA 40H ?
135 ?
22 MTA 70H ?
135 ?
22 MTA 100H ?
155 ?
22 English (GB)
9 5.3 Liquid level 5.3.1 MTA with top suction Fig.
5 MTA with top suction * Min. liquid level (full performance). ** Min. permissible liquid level (reduced performance). 5.3.2 MTA with bottom suction Fig.
6 MTA with bottom suction * Min. liquid level (full performance). TM04
7992 4211 Pump H1 [mm] H2* [mm] H3** [mm] MTA
30 15
60 50 MTA
60 20
70 45 MTA
90 20
85 58 MTA
120 20
110 70 MTA 20H
15 50
40 MTA 40H
20 70
40 MTA 70H
20 80
50 MTA 100H
20 110
60 H1 H2 H3 Max. liquid level Min. liquid level Tank TM04
7993 4211 Pump H1 [mm] H2* [mm] H4 [mm] MTA
30 15
20 10 MTA
60 20
20 10 MTA
90 20
25 15 MTA
120 20
25 20 MTA
200 25
50 30 H1 H4 H2 Max. liquid level Min. liquid level Tank English (GB)
10 6. Electrical connection The electrical connection should be carried out in accordance with local regulations. The operating voltage and frequency are marked on the pump nameplate. Make sure that the motor is suitable for the power supply on which it will be used. The motor must be connected to a motor-protective circuit breaker. We do not recommend operation via frequency converter. Terminal box positions The terminal box can be turned to another position. The terminal box can be turned to another position after delivery. ( ) The terminal box cannot be turned to another position after delivery. The pump must be ordered with the terminal box in position
3 o'
clock. Fig.
7 Terminal box positions (top view) Proceed as follows: 1. Remove the bolts securing the motor to the pump. 2. Turn the motor to the required position. 3. Refit and tighten the bolts securing the motor to the pump. The electric motor should be connected to the supply as shown in the diagram inside the terminal box cover. Warning Never make any connections in the pump terminal box unless the power supply has been switched off. Pump Terminal box positions
9 o'
clock (standard)
3 o'
clock MTA
30 MTA
60 MTA
90 MTA
120 ( ) MTA
200 ( ) MTA 20H MTA 40H MTA 70H MTA 100H ( ) TM05
1759 3611 TM05
1760 3611 Outlet Standard
9 o'
clock Outlet
3 o'
clock English (GB)
11 7. Start-up The pump can be started against an open or a closed discharge valve. Before starting the pump: ? Make sure that all pipe connections are tight. ? Make sure that the pump is immersed to the recommended level. ? Make sure that chip trays are not blocked by impurities. Start the pump as follows: 1. See the correct direction of rotation of the pump on the motor fan cover or on the sight glass. When seen from the top, the pump should rotate counter-clockwise. 2. Start the pump and check the direction of rotation. Fig.