"一","园林清单分部分项工程费","327961.35" "二","技术措施项目费", "三","组织措施项目费","5986.625" "3","安全文明施工费","2330.21125" "四","其他项目费", "五","规费","11477.29" "六","税金","11564.85" "七","工程费用","356990.1" ,"合计工程总价","645589.49" ,,

,"分部分项工程量清单计价表" "" "工程名称:飞凤公园主出入口广场、附属设施",,

,,

,,

"序","项目","项目名称","计量","工程","金额(元)", "号","编码",,

"单位","数量","综合单价","合价" ,,

"分部分项工程清单项目",,

,,

"592736.05" ,,

"

一、主入口铺贴",,

,,

"334701.16" "1","050201001001","主入口广场铺贴(雨花石按摩路,具体做法详见施工图)","m2","113","72.8800390625","8235.445" "2","050201001002","主入口广场铺贴(100*100广场砖路面,具体做法详见施工图)","m2","228","103.220078125","23534.18" "3","050201004001","主入口广场铺贴(植草砖铺装停车位,具体做法详见施工图)","m2","172.80015625","78.8000390625","13616.65" "4","050201001003","主入口广场铺装(体育器材场,具体做法详见施工图)","m2","168","119.610078125","20094.49" "5","040204006001","花岗岩条石树池砌筑(1200*1200mm,具体做法详见施工图)","个","14","274.43015625","3842.0225" "6","040204006002","花岗岩条石花池砌筑(3600*1200mm,具体做法详见施工图)","个","7","413.9703125","2897.7925" "7","050201001004","主入口广场入口半园大理石地面(含灯柱,具体做法详见施工图)","m2","105.300078125","1292.320625","136081.3" "8","050201001005","主入口广场贴面(连接入口半园至旱喷广场,具体做法详见施工图)","m2","55.0400390625","152.690078125","8404.065" "9","050202006001","主入口广场出入口16米直径圆形广场(土建部分,含垫层、集水沟砌体、沟底及侧面抹光、大理石面层及盖板,具体做法详见施工图)","m2","200.96015625","292.07015625","58694.39" "10","050201001006","主入口广场铺贴(表演台,具体做法详见施工图)","m2","231.20015625","150.460078125","34786.35" "11","050201001007","主入口广场、表演台阶(具体做法详见施工图)","m2","45.3600390625","510.1603125","23140.86" "12","050201001003","主入口台阶休息平台江西红贴面(具体做法详见施工图)","m2","9","152.630078125","1373.67125" ,,

"

二、飞凤公园主入口附属设施",,

,,

"258034.89" "13","040101001001","平整场地","m2","507.6003125","2.54000122070312","1289.300625" "14","补","江西红大理石栏杆(含安装)","m","26.62001953125","480","12777.61" "15","040101003001","人工挖基坑","m3","88.450078125","25.47001953125","2252.82125" "16","补","表演台后侧附属房(含基础、砖砌墙体、现浇砼、钢筋制安、门窗、化粪池、背景墙等,具体工作内容详见施工图纸)","处","1","60393.29","60393.29" "17","补","表演台两侧四柱墩台(含基础、砖柱、斗拱、石材贴面等,具体做法详见施工图纸)","座","2","90660.94","181321.88" ,,

"合计",,

,,

"592736.05" ,"措施费项目清单计价表" "工程名称:飞凤公园主出入口广场、附属设施",,

"序号","项目名称","金额(元)" ,,

,"措施项目","15603.45" ,"技术措施项目(以综合单价计价的措施项目)","2733.3225" "1","脚手架、平台、支架工程","1049.480625" "2","模板工程","1683.84125" ,"组织措施项目","12870.13" "3","安全文明施工费(含文明施工、环保、临时设施、安全施工)","3803.0425" "4","七项组织措施费(含夜间施工增加费等七项)","3080.4725" "5","其他组织措施费(发生时按有关规定计算)", "6","安全文明施工费(含文明施工、环保、临时设施、安全施工)","2330.21125" "7","七项组织措施费(含夜间施工增加费等七项)","3656.4125" "8","其他组织措施费(发生时按有关规定计算)", ,"合计","15603.45" ,,