, "项目名称:2014年汕头海关武警执勤信息化机房各驻点商用空调设备采购安装项目",,
,,
, ,,
,,
,"金额:元" "序号","项目内容规格说明",,
"数量","单位","备注" "
一、海尔商用中央空调",,
,,
, "1","海尔空调一拖多式12匹室外机","RFC335MX6","1","台", "2","海尔空调一拖多式4匹室外主机","RFC100MX4","2","台", "3","海尔空调2.
5匹天井式室内机","RFTD71MX套机","3","台", "4","海尔空调2匹天井式室内机","RFTD56MX套机","1","台", "5","海尔空调1.25匹壁挂式室内机","RFG36MX-A","6","台", "
二、中央空调安装辅助材料部分",,
,,
, "1","空调12匹加长工业去油含加厚保温棉铜管",,
"83","米", "2","空调4匹加长工业去油含加厚保温棉铜管",,
"28","米", "3","空调4匹加长工业去油含加厚保温棉铜管",,
"51","米", "4","室内与室外机连接加长PVC排水管(包含保温棉)",,
"168","米", "5","海尔空调(一拖多式)室内机遥控控制器",,
"10","个", "6","海尔空调一拖多式12匹室外机特制不锈钢地脚架",,
"1","副", "7","海尔空调一拖多式4匹室外机特制不锈钢地脚架",,
"2","副", "8","空调2-3匹室内机特制吊杆(每副4条杆)",,
"4","副", "9","海尔空调一拖多式室外主机汇总分歧管",,
"3","套", "10","加长4-12匹铜管增加环保雪种R
410、充氮气吹洗、保压",,
"3","套", "11","室内机专业水钻墙孔与凿墙沟",,
"1","项", "12","室外机与室内机连接信号线电线、线管、线槽、辅料、空气开关及人工费",,
"1","项", "13","一拖多式空调室内、室外机搬运人工费",,
"1","项", "14","空调机高空作业人工费",,
"1","项", "15","空调机设备远程配送费(各驻点机房)",,
"1","项", "16","税管费10%",,
"1","项", "注:
1、此报价为中央空调送风工程、冷媒管道安装、室内空调隐蔽工程设备安装、主机吊装安装、天花拆卸及修复等.",,
,,
, "
2、保修期:整机、压缩机保修18个月.",,
,,
, "
3、工期:30天内完成安装.只能在工作时间施工(8:00-11:30,14:30-17:00),不能影响业主的正常工作,",,
,,
, "必须与现场装修队伍互相配合.",,
,,
, "
4、每台内机旁边需留检修口(石膏板天花,开孔尺寸:40*40),方便今后维修.已有吊顶,棚面以上空间狭小,",,
,,
, "并布有强弱电、给排水等管线,线路复杂,请考虑施工方案.",,
,,
, "
5、通道的天花全部是石膏板造型天花,较为复杂.天花装饰已经安装完毕,安装空调时由中标方自行拆卸天花进",,
,,
, "行安装,施工完毕后必须按原样修复.",,
,,
, "
6、空调连接管经走廊通道天花内与空调内机连接.由中标方负责修复工作,确保楼层的防水.",,
,,
, "
7、排水工程由中标方负责,如损坏天花及其他装修或设备,中标方需负责修复或更换.",,
,,
, "
8、中标方需贯彻对安装员工的施工要求,做到文明施工、不损坏现场其他设施.保持现场的整洁、做好现场的清",,
,,
, "理,绝不留下任何垃圾.施工过程确保铜管清洁、不折、排空、试漏.使用不破损电线、中间不驳接、做好",,