, "7","其他设备及配电设施","套","1",,
,,
, ,"合计",,
,,
,,
, ,,
,,
,,
,,
,"第三部分:金属结构及安装工程全费用计价工程量清单",,
,,
,,
,,
,,
"金额单位:元",,
, "编号","工程或费用名称","单位","数量","单价",,
"合价",,
,,
,,
"设备费","安装费","设备费","安装费", "1","2","3","4","5","6","7","8" ,"第三部分金属结构及安装工程",,
,,
,,
"一","干管工程",,
,,
,,
"1","PE管材De90(0.8MPa)","m","3500",,
,,
"2","管件(3428元/千米)","米管","3500",,
,,
"二","入户管网工程",,
,,
,,
"1","PE管材De32(1.0MPa)","m","5760",,
,,
"2","入户顶管施工(打孔)","处","120",,
,,
"3","管件",,
,,
,,
"a","电熔De90*32三通","个","120",,
,,
"b","水嘴De32","个","120",,
,,
"c","水表De32","个","120",,
,,
"d","入户立管(PE管材)","m","720",,
,,
"e","内牙直接","个","120",,
,,
"f","电熔90°弯头","个","240",,
,,
,"合计",,
,,
,,
,"第四部分:临时工程全费用计价工程量清单(固定费率)",,
,,
,,
,,
,,
"金额单位:元",,
, "编号","工程或费用名称","比例","基数","单价","合价",,
"1","2","3","4","6","7", ,"第四部分临时工程","3%","建筑与安装工程费之和",,
, ,,
,,
,,
, ,,
,,
,,
, ,,
,,
,,
, ,,
,,
,,
, ,,
,,
,,
, ,,
,,
,,
, ,,
,,
,,
,