编辑: 夸张的诗人 | 2019-07-04 |
,"服务内容","收费基数","最高收费标准",,
,,
,,
"备注",,
,,
,"备注" ,,
,,
,,
"100万元以内","101-500万元","501-1000万元","1001-5000万元","5001万元-1亿元","1亿元以上",,
,,
,,
"1","投资估算的编制或审核",,
,"依据建设项目可行性研究方案编制或核对项目投资估算,出具投资估算报告或审核报告","估算价","1.
3‰","1.1‰","0.9‰","0.7‰","0.5‰","0.4‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" "2","工程概算的编制或审核",,
,"依据初步设计图纸计算或复核工程量,出具工程概算书或审核报告","概算价","2‰","1.8‰","1.6‰","1.3‰","1.2‰","1.1‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" "3","工程预算的编制或审核","清单计价法","单独编制或审核工程量清单","依据施工图编制或审核工程量清单,出具工程量清单书或审核报告","预算造价(预算价、招标控制价)","3‰","2.5‰","2.4‰","2.2‰","2‰","1.8‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" ,,
,"单独编制或审核预算造价","依据施工图、工程量清单编制或审核工程量清单报价,出具工程报价书或审核报告","预算造价(预算价、招标控制价、投标报价)","1.8‰","1.6‰","1.4‰","1.2‰","0.9‰","0.8‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" ,,
"定额计价法","编制或审核预算造价","依据施工图编制或审核工程预算,出具工程预算书或审核报告","预算造价(预算价、招标控制价、投标报价)","3.5‰","3‰","2.8‰","2.7‰","2.4‰","2‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" "4","工程结算的编制",,
,"依据竣工图等竣工资料编制工程结算,出具工程结算书","结算价","4.5‰","4‰","3.5‰","3.3‰","3‰","2.5‰","差额定率累计分档累进计费",,
,,
,"差额定率累进计费" "5","工程结算审核",,
"(1)基本收费","依据竣工图、签证资料、工程结算书等进行审核,出具工程结算审核报告","送审结算价","2.8‰","2.5‰","2.2‰","1.6‰","1.3‰","1‰","基本收费为差额定率累计分档累进计费;
总收费=基本收费+效益收费",,
,,
,"基本收费为差额定率累进计费;
总收费=基本收费+效益收费" ,,
,"(2)效益收费",,
"|核减额|+|核增额|","0.0500000381469727" "6","施工阶段全过程造价控制",,
,"工程量清单编制开始到工程结算审核的造价咨询服务","概算价","12‰","11‰","10‰","9‰","8‰","7‰","差额定率累计分档累进计费;
不包驻场人员的费用",,
,,
,"差额定率累进计费;
不包驻场人员的费用" "7","工程造价纠纷鉴证",,
,"受委托进行鉴证","鉴证后标的额","12‰","10‰","8‰","7‰","6‰","5‰","原被告单方有造价或双方均无造价",,
,,
,"差额定率累进计费;
原被告单方有造价或双方均无造价" ,,
,,
"受委托进行鉴证","争议差额","争议差额在1000万以下(含1000万)按5%收取,1000万以上按4%收取",,