编辑: ddzhikoi 2022-11-02
"二层楼屋顶翻修",,

,,

,,

"序号","名称","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","倒瓦、更换苇箔","坡屋面倒瓦、更换苇箔","400","平方米",,

"2","换瓦","破损瓦(脊瓦)拆换,规格与原瓦(脊瓦)相同.

","600","页",,

"3","屋面防水","油毡纸一层.","400","平方米",,

"4","更换檩条","每根3.5米长,小头直径不小于Φ120mm","20","根",,

"5","二层天棚","拆除原天棚,重新做苇箔天棚,主龙骨Φ100mm檩条,每间4根;

次龙骨30*50mm木方;

抹水泥麻刀砂浆,麻刀石灰膏面层.","180","平方米",,

"合计",,

,,

,,

"二层楼改造男女洗手间",,

,,

,,

"序号","名称","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","地面砖","二楼:阳台拖布池拆除,原地面砖拆除,拆除后做防水处理,重新贴300*300防滑瓷砖;

一楼拆除水槽及台阶,原地面砖拆除,拆除后做防水处理,重新贴300*300防滑瓷砖,隔缝6mm.","1","项",,

"2","上水","二楼:原洗手间无上水,根据现场布置上水,上水管主管ppr50,增设井水系统立管De50;

至大便器用ppr管De25,至洗手盆、拖把池用ppr管De20;

拖把池和洗手盆用普通水嘴;

大便池器安装自动冲洗阀;

预留太阳能接口,接口处设置阀门1个;

一楼同二楼.","1","项",,

"3","下水","蹲便器PVC110;

拖把池和洗手池PVC50,蹲便器与洗手盆相应位置增设地漏1个;

排水管PVC110引至楼后1.5米处在主管位置设检查井1个.","1","项",,

"4","防水","二楼地面防水:聚氨酯防水涂料;

","1","项",,

"5","墙面瓷砖","原内墙瓷砖拆除,重新贴内墙瓷砖高度至屋顶,规格250*400瓷砖.","53","平方米",,

"6","蹲便器","瓷质","4","个",,

"7","洗手盆","瓷质","2","个",,

"8","拖把盆","瓷质","2","个",,

"9","隔断","防火隔断,安装高度1.8m.","50","平方米",,

"合计",,

,,

,,

"二层楼更换门窗",,

,,

,,

"序号","名称","工作内容及技术要求","面积","单位","单价(元)","合价(元)" "1","一楼阳台","楼梯东侧阳台西头铝合金拆除,阳台安装普通铝合金窗(含门),门口1个,开启扇1个,浮法玻璃5mm厚.","35.84","平方米",,

"2","二楼阳台","阳台安装普通铝合金窗,带开启窗扇4个,浮法玻璃5mm厚.","96.160078125","平方米",,

"3","前窗","原窗拆除,安装普通铝合金窗,浮法玻璃5mm厚.","43.8000390625","平方米",,

"4","后窗","原窗拆除,安装隔热断桥铝合金窗,带隐形纱窗.","65.9","平方米",,

"5","套装门","原门拆除安装成品套装门,拆除后原门上亮位置用木龙骨石膏板封住.与原墙做好防裂处理.","14","套",,

"6","木门","二楼东头大间安装套装木门一个,2.1米高*0.9米宽.","1.89000122070312","平方米",,

"合计",,

,,

,,

,,

,,

,,

,,

,,

,,

"二层楼电路改造",,

,,

,,

"序号","项目","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","电相表","安装总电度表箱1台:东山明设;

","1","个",,

"2","100A双开关","在总电镀箱内安装,设置250空调开关.","3","个",,

"3","铜铝鼻子","箱内接线用","1","项",,

"4","分户配电箱","设置漏电保护器一个,开关一个.","15","个",,

"5","漏电保护器","室内空调使用","15","个",,

"6","插座","室内安装","45","个",,

"7","线盒","室内开关、插座、灯具安装","60","个",,

"8","半圆形LED节能灯","室内吸顶安装","40","套",,

"9","开关","室内安装","30","个",,

"10","铜线(6平方)","BV6总表箱至分户箱用","4","盘",,

"11","铜线(4平方)","BV4插座用","8","盘",,

"12","铜线(2.5平方)","BV2.5灯具用","8","盘",,

"13","铜线(1.5平方)","BV1.5开关用","8","盘",,

"14","接地线","BV4平方","6","盘",,

"15","电缆","配电室至总配电箱,YJV3*50+1*25;

穿套管.","15","米",,

"16","电线套管","剔槽暗设","1","项",,

"合计",,

,,

,,

"二层楼内部墙面粉刷",,

,,

,,

"序号","名称","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","楼梯西房间内墙","原墙面清理,满刮腻子,刮仿瓷涂料.一层、二层共4间.","301.38015625","平方米",,

, "2","楼梯西房间内墙墙裙、踢脚线","内墙墙裙、踢脚线刷丙烯酸涂料,内墙墙裙、踢脚线同原来高度.一层、二层共4间.","23.67001953125","平方米",,

, "3","楼梯东房间内墙","原墙面清理,满刮腻子,刮仿瓷涂料.一层、二层共12间.","253.24015625","平方米",,

, "4","楼梯东房间内墙墙裙、踢脚线","内墙墙裙、踢脚线刷丙烯酸涂料,内墙墙裙、踢脚线同原来高度.一层、二层共12间.","9.28","平方米",,

, "5","走廊内墙","原墙面清理,满刮腻子,刮仿瓷涂料.","250.87015625","平方米",,

, "6","走廊内墙墙裙、踢脚线","内墙墙裙、踢脚线刷丙烯酸涂料,内墙墙裙、踢脚线同原来高度.","51.0800390625","平方米",,

, "7","楼梯间内墙","原墙面清理,破损部位清理后用水泥砂浆找补,满刮腻子,刮仿瓷涂料.","109.420078125","平方米",,

, "8","楼梯间内墙墙裙、踢脚线","内墙墙裙、踢脚线刷丙烯酸涂料,内墙墙裙、踢脚线同原来高度.","12.770009765625","平方米",,

, "9","楼梯踏步刷漆","楼梯水泥踏步刷调和漆.","20.86001953125","平方米",,

, "10","楼梯间原楼梯铁栏杆刷漆","原楼梯铁栏杆刷调和漆.","8.6000048828125","平方米",,

, "11","楼梯间原楼梯木扶手刷漆","原楼梯木扶手刮腻子、刷调和漆.","2.5","平方米",,

, "12","仓库内墙及阳台前挑梁","原墙面清理,满刮腻子,刮仿瓷涂料.","64.7800390625","平方米",,

"13","仓库内墙墙裙、踢脚线","仓库内墙墙裙、踢脚线刷丙烯酸涂料,内墙墙裙、踢脚线同原来高度.","3.60000244140625","平方米",,

"14","二层阳台栏杆刷漆","二层阳台铁栏杆除锈、刮腻子、刷防锈漆和调和漆.30米长*0.9米高.","27","平方米",,

"15","栏杆底座刷丙烯酸","二层阳台栏杆水泥底座刷丙烯酸.","7.5","平方米",,

"16","内墙抹灰","内墙破损部位铲除后清理,用1:3水泥砂浆抹面.","570","平方米",,

"合计",,

,,

,,

"二层楼外墙保温",,

,,

,,

"序号","项目","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","后墙","清理基层,原墙(含挑檐)破损部位水泥砂浆找补,专用胶浆粘贴50mm挤塑聚苯板(防火等级B1级),专用胶浆网格布,柔性腻子弹性涂料(颜色同宿舍楼).","225","平方米",,

"2","前墙","清理基层,柔性腻子弹性涂料(颜色同宿舍楼).","45","平方米",,

"3","东西山","清理基层,原墙(含挑檐)破损部位水泥砂浆找补,专用胶浆粘贴50mm挤塑聚苯板(防火等级B1级),专用胶浆网格布,柔性腻子弹性涂料(颜色同宿舍楼).","150","平方米",,

"合计",,

,,

,,

"二层楼石膏板隔断",,

,,

,,

"序号","项目","工作内容及技术要求","数量","单位","单价(元)","合价(元)" "1","二楼东头大间石膏板隔断","金属龙骨石膏板隔断,加隔音板.","20.1","平方米",,

"合计",,

,,

,,

下载(注:源文件不在本站服务器,都将跳转到源网站下载)
备用下载
发帖评论
相关话题
发布一个新话题