1974 6.39 6.77 7.61 14.2 10.9 22.8 8.60 9.27 3.01 3.82 2.89 2.62 96.88 8.07

1975 2.24 3.26 4.35 15.6 8.79 13.3 8.11 6.91 6.42 5.78 5.84 6.39 86.89 7.24

1976 5.13 7.94 8.05 26.6 13.5 25.1 32.7 7.45 3.13 4.36 3.45 3.07 140.48 11.7

1977 2.52 4.75 10.3 13.8 50.0 36.2 16.8 13.0 5.10 4.06 5.19 3.37 165.09 13.8

1978 2.81 3.02 9.06 12.3 14.8 7.88 7.44 5.35 4.04 3.97 2.98 4.50 78.15 6.51

1979 6.90 6.70 10.8 17.8 26.5 29.6 31.9 22.1 9.25 7.63 5.59 3.86 178.63 14.9

1980 3.24 4.20 13.5 18.5 29.7 26.4 36.6 11.1 19.6 8.85 7.71 7.99 187.39 15.7

1981 4.61 6.56 7.50 9.71 21.9 38.2 8.59 7.62 4.60 3.34 2.35 2.33 115.79 9.65

1982 1.98 8.62 4.64 5.56 15.2 17.7 7.59 18.1 10.9 7.06 13.6 6.98 117.93 9.83 合计 95.0 130.11 200.06 299.53 523.89 579.88 309.54 209.29 150.57 110.09 114.07 85.25 2807.28 234.12 平均 4.52 6.20 9.52 14.3 24.94 27.61 14.74 9.59 7.17 5.24 5.44 4.06 133.68 11.14 表4 坝址水位―流量关系曲线 水位(m) 84.3 84.6 85.0 86.0 87.0 88.0 89.0 90.0 91.0 92.0 93.0 流量(m3/s)

0 5

50 220

500 855

1280 1730

2370 2990

3630 表5 水库容积曲线 高程(m)

90 95

100 105

110 115

120 125

130 135 面积(km2) 0.146 0.955 1.768 2.632 3.440 4.350 5.281 6.287 7.206 8.088 容积(万m3)

0 275

956 2060

3574 5522

7935 10830

14200 18020 2.坝址地形地质条件 (1)左岸:地形自然坡度为1:1.5~2.0,覆盖层2~3m,全风化带厚3~5m,强风化加弱风化带厚5m,微风化厚4m. (2)河床:岩面较平整.冲积沙砾层厚约0~1.5m,弱风化层厚1m左右,微风化层厚3~6m.河床纵剖面地形中,迎水面坝踵处岩面高程约在86m左右,背水面坝趾处岩面高程约在83.5m左右.距坝趾下游15m处有一深潭.高程约81m,整个河床皆为微、弱风化的花岗岩组成,致密坚硬,强度高,抗冲能力强. (3)左岸:地形自然坡度为1:2左右,覆盖层4~6m,全风化带厚6~8m,强风化带厚2~4m,弱风化带厚2~4m,微风化厚1~12m. (4)坝基开挖:强风化层要全部挖除.坝基的开挖范围应与建筑物的底部轮廓尺寸相适应,开挖的深度按坝底应力和坝基强度而定. (5)坝后式厂房基础:厂房设于坝后靠右岸的河床处,设计最低开挖高程为79~83m之间,全部处于微风化新鲜基岩内. 3.主要施工条件 (1)对外交通:目前已有两条三级公路分别从两岸经过坝首和坝区. (2)施工电源:目前已有35KV输电线路有县城架至G镇,距坝址仅3km,施工用电可利用本县电网中的水电,电源充足,质量可靠. (3)主要建筑材料:本枢纽主坝为砼重力坝,坝体砼所需的卵石,在坝址上下游1~2km均可开采,河砂在距坝址10km处的下游采集.库内盛产竹木,自给有余.仅水泥、钢筋、机电设备等需要外购. 5.施工年限 本工程主体部分的大坝和电站厂房,施工工期为两年左右,准备工程在第一施工年度的4~7月份完成,水库在第三施工........