8 A.M. Monday, or
8 A.M. the day following the holiday. Reports shall be electronically available unless otherwise specified. The Contractor shall develop reporting formats, with NASA concurrences, that are electronically available and retrievable per Annex 8. Proposed changes to required forms will be submitted to the Administrative *TMR for consideration and approval. 1.1.4.c. Submittals. Detailed plans, manufacturer'
s installation, testing and product data, and other submittals that are required on an infrequent or one-time basis are identified in the applicable annexes. Typically, the required submittals require the Contractor to propose or define his plan or methodology of providing a specified service. Updates are required whenever changes to the stated plan occur. Selected submittals and outline instructions for the development of the format are contained on individual DRD'
s in Section J, Attachment C. Due dates are specified for each separate submittal. When the due date falls on a Saturday, Sunday, or holiday, the submittal is due by
8 A.M. Monday, or
8 A. M. the day following the holiday. Unless otherwise specified, the Contractor shall develop other submittal formats, with NASA concurrenc........